Project: West Suburban Bank  (Aurora, IL)


​        J.Gill and Company was hired to replace the entire topping slab on the elevated parking structure at the West Suburban Bank in Aurora, IL. The 5" thick topping slab had experienced significant cracking and deterioration over the years. After removal, a new mat of rebar was installed and the concrete alternating pour configuration was used to keep the topping slab joints in-line with the precast joints below. The existing pre-cast concrete railing system was also removed and replaced with a galvanized steel barrier cable system. 


8150 West 185th Street (Suite G)

Tinley Park, IL 60487

P: (708) 596-4455

​F: (708) 904-4175